Video: The process of painting Boeing 737 aircraft covers

The process of coating the entire commercial aircraft case takes place very meticulously with a duration of up to 10 days and costs up to $ 200,000.

Picture 1 of Video: The process of painting Boeing 737 aircraft covers
After finishing painting, the aircraft weighs 252kg more.

First the worker cleaned the aircraft case, painted the lining and then coated the coat. The painting process requires 8-15 people to work continuously and last 8-10 days.

To paint a complete Boeing 737, the paint is covered with a large capacity sprayer with low pressure. The aircraft weighs 252kg after painting. The paint can withstand temperatures from -153 degrees to 176 degrees C.

A typical airplane takes about 12 hours to 1 week to dry, the whole process costs about 100,000-200,000 USD.