Building monitoring station at Lam Dong bauxite-aluminum project

On October 8, Mr. Luong Van Ngu, deputy director of Lam Dong Department of Natural Resources and Environment, confirmed that he was promoting the construction of a monitoring station right at the Lam Dong bauxite - aluminum complex project.

>>>Lam Dong develops wind power

Picture 1 of Building monitoring station at Lam Dong bauxite-aluminum project
A corner of Tan Rai alumina plant

The mission of this monitoring station is to monitor, measure, detect and alert new chemicals that appear outside the environment; regularly check rainwater in factories discharging into the environment to promptly detect abnormal substances to take timely measures.

Earlier, on October 7, Deputy Minister of Natural Resources and Environment, General Director of Environment, Mr. Bui Cach Tuyen and the Environmental Monitoring Team went to inspect the bauxite site - aluminum Lam Dong.

After surveying the area of ​​chemical storage tanks, red mud reservoirs, coal-fired power plants and coal gasification plants, bauxite sorting and dumping workshops, Mr. Bui Cach Tuyen asked the Project Management Board. Bauxite - aluminum Lam Dong enhances supervision, resolutely manages not to make mistakes happen.

Try to speed up the construction of red mud reservoir to promptly put the alumina plant into operation as soon as possible. At the same time, special attention should be paid to the safety and quality of this project.